During march 2021, we have moved from the campus at Adamstuen in Oslo to Ås (30 min drive from Oslo center).
Installed in a completely new fancy building, the laboratory has received a batch of new equipments and is now fully operational. Designed to improve collaborative work and for good environment, health and safety, we are located on the 3rd floor as part of the Physiology Unit.
A brand new and state of the art model fish facility for medaka and zebrafish has been put in place. There also, many new equipments have been installed (injection, fluorescent microscope, dissection microscope with cameras).
New opportunities now arise. Happy to be part of that.